757 Coastal
Change Work Order #2 — Scope of Work & Estimate
27 Booker Street · Hampton, VA
27 Booker Street — CWO #2
$2,200.00 CWO #2 — Added Repair
27 Booker Street · Hampton, VA 23663
TPO Roof · Gutter Transition · 3 Windows
View PDF Expires: 09/08/2026
Project Overview
Customer: Rob Carey
Project: CWO #2 — TPO Roof & Windows
Address: 27 Booker Street, Hampton, VA 23663
Base Job: Est #1204 → Invoice #335 ($1,250 · deposit paid)
Duration: 1 day
Additional to: CWO #1 (siding repair)
Included Scope
10100General Conditions & ManagementIncluded
  • Jobsite protection, daily clean-up, debris containment
  • Coordination of the roof + window repair sequence
  • Covered — no charge on this change order
10101Trashout / Debris RemovalIncluded
  • Removal and haul-off of old TPO membrane and roofing debris
  • Covered — no charge on this change order
10104TPO Roof Replacement — Front Porch (126 SF)$1,200.00
  • Remove existing TPO membrane (no insulation layer — bare porch deck)
  • Install new 60-mil TPO, fully adhered to deck
  • Heat-weld all seams (min 1.5" overlap)
  • New metal drip edge / edge termination at all perimeters
  • TPO base flashing at porch wall + termination bar
  • Verify drainage — no ponding
10104TPO Transition Lip — Rear Roof (8 LF)$200.00
  • Heat-weld 60-mil lip piece (~10" wide) to existing membrane (min 1.5" overlap)
  • Lip extends 1–2" into the gutter channel — continuous smooth water flow
  • Rear roof TPO in excellent condition — membrane stays
10104Gutter Lower / Rehang — Rear Roof (15 LF)$275.00
  • Lower gutter to correct height with proper slope (~1/4" per 10')
10110Exterior Windows — J-Channel & Caulk (3)$525.00
  • Redo J-channels at proper 45° in all 3 windows (flat install = the leak cause)
  • Remove old caulk & re-caulk J-channel/window-metal joints on all 3
  • Pull windows only if needed to seal properly
Site Photos
Payment Schedule — 50 / 50
Draw 1 — Deposit
50%
$1,100.00 upon signing
Draw 2 — Final
50%
$1,100.00 upon completion
Itemized Estimate — CWO #2
10100 — General ConditionsIncluded
10101 — Trashout & Debris RemovalIncluded
10104 — TPO Roof Replacement (front porch, 126 SF)$1,200.00
10104 — TPO Transition Lip (rear roof, 8 LF)$200.00
10104 — Gutter Lower / Rehang (15 LF)$275.00
10110 — Windows (J-channel redo + caulk, 3)$525.00
CWO #2 TOTAL$2,200.00
Terms & Conditions

By agreeing to these Terms and Conditions, the customer acknowledges and accepts the outlined responsibilities and scope of work.

Scope: All work described in the Included Scope above. Any work not listed is not included unless agreed in writing. This is Change Work Order #2 on accepted Invoice #335 — additional to CWO #1 (siding repair).

Not included: TPO membrane replacement on the rear roof (excellent condition), insulation (none present), structural/deck work, gutter replacement (unless rotted), interior work, painting. General Conditions + debris removal are INCLUDED — no charge on this change order.

Contractor supplies: 60-mil TPO membrane, primer, seam cleaner/roller, termination bar + fasteners, metal drip edge, J-channel, exterior caulk, gutter fasteners.

Notes:
**Jobsite will be left clean once completed.

Warranty:
**12 months workmanship.

Payment Terms:
· Total Project Cost: $2,200.00
· Deposit to Schedule: $1,100.00
· Final Payment: $1,100.00

Check is a preferred method.
**Payments via Zelle.

Validity: one (1) week from the date above.